The proposed James Bay II would have destroyed four river systems and deforested an area the size of Maine, Vermont and New York combined.
Evidence
So it was that when Hydro-Quebec came forward with a set of proposals known as James Bay II in the late 1980s, they were met with resistance. Their proposed new projects would have destroyed four major river systems: the Great Whale, Lower Broadback, Nottaway, and Rupert, and would have also flooded Lake Bienville. Further, James Bay II would involve the total deforestation of some 922,040 square kilometers of land, an area the size of Maine, Vermont, and New York State combined. That $60-billion megaproject, according to National Audubon Society’s Jan Beyea, “would make James Bay and some of Hudson’s Bay uninhabitable for much of the wildlife now dependent on it.” According to the society, if James Bay II were constructed, “in fifty years, [this entire] ecosystem will be lost.” — Winona LaDuke, All Our Relations, 345
Categorization
- SEED: Angle: ‘An area the size of three states’ — translating abstract megaproject statistics into comparable geography for general readers.
- factual_claims: Concrete, quotable figures and geography: $60 billion, 922,040 square kilometers, four named rivers — the specific scale data the reader wants for case content.
Mesh connections
- Builders destroyed the very natural features their subdivisions were named for exemplifies this claim — The Bulldozer in the Countryside: Suburban Sprawl and the Rise of American Environmentalism
- The James Bay II megaproject’s ecological destruction is a specific instance of developers destroying the natural features they exploit.
- this claim exemplifies Colonial order was achieved by destroying villages and rebuilding them to match plans — Colonising Egypt
- James Bay II’s destruction of rivers and forests exemplifies colonial reordering of territory through infrastructure violence.