Regulatory hazard models can be built on samples too small and too incompletely observed to support the risk estimates they authorize.
Evidence
Even assuming valid mea sure ments, the fi ftysevenyear record was quite limited in scope, containing only twentytwo storms in total for Zone B, a record that was insuffi cient to generate anything like a statistically signifi cant rendering of the distribution of potential storms from a multicentury perspective. Moreover, even with respect to the data that were available, one of the most severe observed storms was not used in the construction of the SPH because, according to a footnote in the 1959 report, many of the key model calculations had already been completed by the time the storm occurred. — Douglas A. Kysar, Regulating from Nowhere, 208
Categorization
- SEED: A model of statistical humility: compare the SPH’s fifty-seven-year, twenty-two-storm record against how confidently contemporary agencies assign hundred-year flood or hurricane risk.
- XREF: Connects directly to the polyad’s Eco-Justice and Soundscape threads: both involve expert measurement regimes whose objectivity dissolves under scrutiny of sample size and method.
- factual_claims: It documents concrete deficiencies in the data underlying the Army Corps’ Standard Project Hurricane: only twenty-two storms in Zone B, and a severe storm omitted because calculations were already finished.
Mesh connections
- Untested risk models can detain people on factors having no real predictive value exemplifies this claim — The Alignment Problem
- Pretrial detention exemplifies the concrete harms of building decisions on inadequate risk model data.
- Using a model can make markets conform less well to it. illuminates this claim — An Engine, Not a Camera: How Financial Models Shape Markets
- Feedback effects of model use explain how small samples get amplified into authoritative risk estimates.