Reclassifying contaminated soil volume from 171,000 to 54,000 cubic yards saved GM over $15 million.
Evidence
The redesignation by EPA meant that GM would have to dredge and/or treat only 54,000 cubic yards of contaminated soils, in contrast to the 171,00 cubic yards it currently has on-site or in nearby rivers and creeks. This redesignation of the numbers has saved General Motors over $15 million dollars in cleanup costs. — Winona LaDuke, All Our Relations, 113
Categorization
- SEED: A piece tracking exactly how ‘redesignation of the numbers’ functions as the quiet instrument of environmental deregulation — the arithmetic of impunity.
- factual_claims: Supplies precise quantities — 54,000 versus 171,000 cubic yards, $15 million saved — documenting how reclassification translates into concrete avoided cost.