Mega-hydro development on Innu land proceeded without consultation or compensation, flooding territory that anchored Innu identity.

Evidence

There exist already 15,000 megawatts of hydroelectric power from installations in Innu territory, and the reservoirs total approximately 4,500 square kilometers (excluding the 6,700 square kilometers in Smallwood). We have already paid too much. We were never consulted or even informed [when] the dam at Churchill Falls began, and we were never compensated for the damage from the flooding. Our people lost not only our lands and possessions when Mishikama was flooded to create the Smallwood Reservoir, but also a part of our history and identity as Innu. We will accept no more developments imposed from the outside. All discussions on the subject of development must include the Innu. — Winona LaDuke, All Our Relations, 361

Categorization

  • XREF: Directly on the same legal terrain as Johnson v. M’Intosh — unilateral state/utility seizure of Indigenous land title without tribal consent. Core polyad bridge for Legal Systems’ land rights course.
  • SEED: Essay angle: ‘Dam Nation — how Canadian hydro exports to New England are built on unceded Innu land,’ tying the James Bay/Smallwood history to US utility contracts.
  • causal_relationships: It traces a causal chain: unconsulted dam-building floods the Smallwood Reservoir, which destroys not only Innu lands and possessions but their history and identity as a people.