Hydro-Quebec answered one blocked megaproject by announcing another dam on the Sainte Marguerite within Nitassinan.

Evidence

In 1993, at the height of James Bay resistance, the utility announced that in addition to the 19 dams it had already built in Nitassinan, it would build another dam on the Sainte Marguerite River. That dam, with a price tag of $2 billion, would divert the Moisie River’s two tributaries, the Pekans and the Carheil, and cut the river’s flow by 40 percent at the confluence of the three rivers. — Winona LaDuke, All Our Relations, 348

Categorization

  • XREF: Bridges directly to the legal-land-rights course: dam siting inside Nitassinan is the same doctrine-of-discovery terrain as Johnson v. M’Intosh playing out in a live regulatory fight.
  • factual_claims: Concrete present-day case details: $2 billion cost, 19 existing dams, Sainte Marguerite/Moisie river names, and a 40 percent flow reduction at a specific confluence.

Mesh connections