Building high upslope cairn walls maximized labor for no functional gain, undercutting a field-clearing explanation.

Evidence

If I were going to dispose of rock in this fashion I could see the rationale of building up the downslope and side walls to create a structure into which more rock could be dumped. But why build up the upslope wall so that rock would have to be hauled up and then dumped over a height of 1 to 2 meters? That would have made the work of getting rid of all that rock much more labor-intensive than just dumping it into an expanding cairn. — Tom Wessels, Forest Forensics, 24

Categorization

  • SEED: An essay angle: inferring purpose from inefficiency—when design makes no sense, intent must lie elsewhere.
  • contrarian_or_surprising: It uses design inefficiency as negative evidence against the obvious practical interpretation of the cairns.

Mesh connections