An $80 million waste plant in Flint employed no people of color in construction.
Evidence
One Michigan court recently recognized that there is often a gap between the promise and the reality of economic beneļ¬ts in vulnerable communities that host waste facilities. In a case in which a community group challenged a waste incinerator, the Genesee Power Station in Flint, Michigan, the court took note of the fact that the newly constructed $80 million plant failed to employ one person of color in its construction. The court further noted that only one of thirty permanent positions at the plant was occupied by a person of color, and that person was hired at minimum wage. The court concluded, as have many communities, that āthe people who will beneļ¬t from the proļ¬ts of the plant do not reside in the neighborhood. However, those who will bear the brunt of the pollution cannot even obtain employment in the plant.ā ā Luke W. Cole and Sheila R. Foster, From the Ground Up, 379 (
#corroborates, via linked claim)
Categorization
- XREF: connects to: A court found an $80 million incinerator employed no people of color ā Luke W. Cole and Sheila R. Foster, From the Ground Up: Environmentalā¦, 379
Related
- A court found an $80 million incinerator employed no people of color (similarity 0.95)
Broader Connections
- A court found an $80 million incinerator employed no people of color
#corroborates(0.95) ā Luke W. Cole and Sheila R. Foster, From the Ground Up, 379