A public housing project sat fifty feet from a lead smelter that emitted over 269 tons of lead particles annually.

Evidence

The housing project, which was built in the mid-1950s, was located just fifty feet from the sprawling West Dallas RSR lead smelter’s property line and in a direct path of the prevailing southerly winds. The secondary smelter recovered lead from used automobile batteries and other materials. During peak operation in the mid-1960s, the plant employed more than 400 persons. However, it pumped more than 269 tons of lead particles each year into the West Dallas air. — Robert D. Bullard, Dumping in Dixie, 298

Categorization

  • CANDY: The starkness of ‘fifty feet’ and ‘269 tons of lead’ makes it an elevator-ready illustration of environmental injustice.
  • XREF: Foundational empirical case for the disproportionate-siting pattern this reader needs to pair with noise-burden findings.
  • factual_claims: Specific, load-bearing data points: the fifty-foot set-back, the mid-1950s construction date, and 269 tons of annual lead emissions document the hazard-siting pattern this book exists to establish.

Mesh connections